Project Summary
As a sub-consultant to Studio Architecture, Cobb Engineering Company provided civil site design services for several facilities throughout Woodward’s Crystal Beach Park.
- 6 Baseball Fields
- Aquatic Park
- Rodeo Arena
- Parking Lots and Entrance Roads
- City Equipment Building
- Water Line Replacement Throughout Park
- 40 Acre Development
- Total Civil Construction Cost = $4,500,000
Services provided include:
- Demolition Plan
- Private and Public Utility Relocations
- Grading and Drainage
- Retaining Wall Design

- ADA Compliant Sidewalk Layout
- Building Pad Elevations
- Parking Lot Design
- Signage and Striping
- Roadway Layout
- Storm Drainage Design
- Storm Water Pollution Prevention Plan
- Construction Plans and Specifications
- Cost Estimates