The Proof Is In Our Projects

Across nine decades, Cobb Engineering Company has earned the respect of clients and contractors alike with a no-nonsense approach to making each project its very best.

A true dedication to quality from start to finish – from initial designs through final punchlists – has allowed Cobb to build some of the most respected projects in Oklahoma AND a stellar reputation for quality work done on-time and on-budget.

Here are several of our very best jobs.

NW 5th AND MAIN STREET STREETSCAPE - Oklahoma City, OK
CLICK TO ENLARGE PHOTOS

PROJECT DESCRIPTION:
Project No. MP-0298 is a streetscape on NW 5th Street from Walker Avenue to Harvey Avenue and Robinson Avenue to Broadway Avenue, and Main Street from BNSF Railroad to Walnut Avenue.

DESIGN FEATURES:
The City of Oklahoma City desired to narrow NW 5th Street for traffic calming measures, widen sidewalks, incorporate decorative medians and sidewalks, traffic signal modifications, as well as landscape features. Conversion of NW 5th Street to two-way between Walker and Hudson was necessary for completion of the project. The Main Street section includes new curb and gutter, as well as refurbished sidewalks. A wayfinding connection between NW 5th Street and Main Street was also included in this project.

 

PROJECT NUMBER:
MP-0298

PROJECT SCHEDULE:
Aug. 2004 – Oct. 2005

CONTRACTOR:
Rudy Construction

COSTS:
$2,345,365.95

REFERENCE:
Rick Hargett
Contract Administrator
City of Oklahoma City
420 W. Main, Ste. 700
Oklahoma City, OK 73102

PROJECT MANAGER:
Kelly E. Farmer

CROSS TIMBERS MUNICIPAL COMPLEX - City of Edmond, OK
CLICK TO ENLARGE PHOTOS

PROJECT DESCRIPTION:
Cobb Engineering Company (CEC) is providing the Construction Management/Inspection Services for the Cross Timbers Municipal Complex located on 137 acres at the southeast corner of I-35 and Covell in Edmond, Oklahoma.  The project includes the construction of an Animal Welfare Facility, Fire Training Facility including Fire Station #5, and a Public Service Center Facility.  Infrastructure, including waterline, sewer line, communications, utilities, and roadways, is also being developed.

Services provided by CEC as the Construction Management for this project include; value engineering, observations of contractor’s survey, quality assurance/quality control, facilitation of pre-bid and pre-award meeting, report preparation, and any other general administration typically involved in Construction Management.

The architects for the Cross Timbers Municipal Complex include:

  • The Orion Group, LLC – A/E of Record, Public Service Center
  • LWPB Architects – A/E of Record, Fire Training/Admin./Station #5
  • Selser Schaefer Architects – A/E of Record, Animal Shelter
  • City of Edmond Engineering Department – Engineer for Water/Sewer Utilities

 

OWNER:
The City of Edmond

PROJECT SCHEDULE:
February 2004-Present

COSTS:
Approximately $20,000,000 Project

REFERENCE:
Clay Coldiron
Public Works Director
City of Edmond
100 E. First Street
Edmond, OK  73034
405.359.4434

PROJECT MANAGER:
Brian E. Glover, P.E.

WATER MAIN EXTENSION - Oklahoma City, OK
CLICK TO ENLARGE PHOTOS

PROJECT DESCRIPTION:
This project includes a water main extension (42” and 36”) from the Lake Hefner Water Treatment Plant seven and one half miles to Booster Pump Station No. 18.  The water main had to be designed to minimize existing utility crossings, a proposed aerial creek crossing was designed and a highway crossing was coordinated with the Oklahoma Turnpike Authority along the Heffner and Britton Road Route.  Also included in this project was the evaluation and upgrade design for Booster Pump Station No. 18.  The proposed design will increase the capacity to 8 million GPD.

DESIGN FEATURES:

  • Preliminary Investigation and Study
  • Preliminary Report
  • Topographic/Property Survey
  • Final Plans and Specifications
  • Utility Coordination Meetings (Private and Public)
  • Complete Final Construction Documents in 4 Bid Phases
  • Oklahoma Turnpike Authority Coodination

 

OWNER:
City of Oklahoma City

PROJECT SCHEDULE:
November 2003- Present

COSTS:
$8,200,000.00

REFERENCE:
Mr. Sam Samundi, P.E. Civil Engineer Water and Wastewater Utilities Dept. Engineering Division
420 W. Main, Suite 500

PROJECT MANAGER:
J. Carthal Cobb, P.E.
Bryan Richards, E.I.

VALUE PLACE HOTEL - Del City, OK
CLICK TO ENLARGE PHOTO

PROJECT DESCRIPTION:
Engineering and survey services associated with developing site design plans for the Value Place Hotel located northwest of the intersection at Scott Street and I-40 in Del City, Oklahoma.

DESIGN FEATURES:

  • ALTA and Topographic Survey
  • Dimensional Control and Site Plan
  • Grading, Drainage and Paving Plan
  • Erosion Control Plan
  • Utility Coordination
  • Utility Plans
  • Driveway Details
  • Administration Services
  • Construction Staking and Geometric Layout of the Final Site Design

 

OWNER:
Value Place Hotel

PROJECT SCHEDULE:
February 2004 – October 2004

CONTRACTOR:
ERC Construction

COSTS:
$3,500,000.00 (Estimate)

REFERENCE:
Kevin Stuckey Consolidated Residential, LLC
8621 East 21st Street, Suite 180
Wichita, KS 67206

PROJECT MANAGER:
Bryan Richards E.I.
Wilson Darnell - Mann Architects

SH 99 AND RICHARDSON LOOP - ADA, OK

PROJECT DESCRIPTION:
Design of a new four lane divided highway alignment for SH 99 from SH 3W on the east side of Ada north approximately 1.5 miles. This project included design of a trumpet interchange with a bride over SH 99. Also included were new traffic signals for the intersection of Broadway Avenue in Ada, Oklahoma.

DESIGN FEATURES:
A conceptual study was completed to determine the best and most feasible interchange configuration. Traffic control and construction sequencing was critical to maintain traffic on the existing JA Richardson Loop which became an exit ramp to the City of Ada as part of the project. Geotechnical investigations were required to properly design the new facility in rocky terrain where large cuts and fills were needed to meet design standards.

 

OWNER:
Oklahoma Department of Transportation

PROJECT SCHEDULE:
April 1998-June 2002

CONTRACTOR:
Sewell Brothers, Inc.

COSTS:
$8,292,286.30

REFERENCE:
Chris Senkowski, P.E.
Oklahoma Department of Transportation
Roadway Design Division
200 N.E. 21st Street
Oklahoma City, OK 73105

PROJECT MANAGER:
Martin P. Hepp, P.E.
J. Taylor Barnes, P.E.

EUFAULA MUNICIPAL AIRPORT - Eufaula, OK
CLICK TO ENLARGE PHOTOS

PROJECT DESCRIPTION:
Widen existing runway from 40 feet to 60 feet, asphalt overlay, and mark runway 17-35 and reconstruct, widen and mark taxiway.  Grade and drain runway safety area and reconstruct and expand tie-down apron.  Also a new warm-up apron was added.  Installation of runway and taxiway lights, lighted wind- cone and rotating beacon.

 

OWNER:
The City of Eufaula

PROJECT SCHEDULE:
May 2002-May 2003

CONTRACTOR:
Tiger Industrial

COSTS:
$400,000.00

REFERENCE:
Gordon Pennington
City of Eufaula
P.O. Box 684
Eufaula, OK 74432

PROJECT MANAGER:
Terry S. Leard, P.E.

 

 

 