Layout Image
  • Home
  • Our Company
    • History
    • Civil Servants
    • Officers
    • Managers
  • Services/Portfolio
    • Transportation
    • Land Development
    • Water
    • Airport
    • Power
    • Survey
    • GIS
    • Construction Management
    • Materials Testing
  • Contact Us
  • Careers
    • Current Openings
    • Employment Application
    • Internships and Scholarships

Transportation Projects

  • Transportation
    • DESIGN
      • I-40 Crosstown
      • I-35 Widening
      • NW 164th St Widening
      • On Demand Right of Way
      • OKC Street Conversions
      • Enid Bridge Rehabs
      • US-287 Realignment
      • Creek Turnpike Interchange
      • Cow Creek – OSU
      • On-Demand H&H
      • Tulsa Inner-Dispersal Loop
      • Owasso Streetscape
      • Tulsa Maintenance Zone
      • Tulsa SW Boulevard
    • PLANNING
      • County NEPA Services
      • OFF-System Bridge Inspection
      • ON-System Bridge Inspection

Tulsa Maintenance Zone

By Cobb Engineering Company
Monday, April 23rd, 2012

Project Summary

Cobb Engineering Company provided rehabilitation plans for Maintenance Zone 9043 for the City of Tulsa. Maintenance Zone 9043 is bounded by the Arkansas River to the west, E. 41st St. S. to the north, S. Lewis E. Ave. to the east and I-44 to the south. This project consisted of rehabilitation of 8 areas in this zone. Areas 1 and 2 included asphalt mill and overlays at Detroit Ave. and E. 46th St. S. and E. 45th Ct. S. Areas 3, 4 and 5 were reconstruction of concrete roadways with curb and gutter, sidewalks and storm sewer design in some areas. Area 3 included E. 45th Pl. S. between S. Madison Pl. and S. Peoria Ave. Area 4 included E. 42nd Pl. S. and E. 43rd St. S. between S. Peoria Ave. and S. Rockford Ave. Area 5 included E. 45th Pl. S. between S. Rockford Ave. and S. St. Louis Ave. Area 6 is asphalt pavement reconstruction of E. 45th Pl. S. west of S. Victor Ave. Area 6 also included 437 linear feet of 6” water line. Area 7 included asphalt mill and overlay of E. 43rd St. S. between S. Victor Ave. and S. Oak Rd. Area 8 included asphalt pavement reconstruction of E. 48th St. S. east of S. Yorktown Pl. and asphalt mill and overlay of S. Yorktown Pl. north of E. 48th St. S. Area 8 also included 373 linear feet of 6” water line.

Cobb provided the following services:
•    Survey
•    Roadway Design
•    Drainage Design
•    Water Line Design
•    Construction Administration
•    As-Built Drawings

Categories : Transportation Design, Transportation Projects
  • Services

    TRANSPORTATION
    LAND DEVELOPMENT
    WATER/WASTEWATER DESIGN
    AIRPORT PLANNING AND DESIGN    
    POWER
    SURVEY
    GIS
    CONSTRUCTION MANAGEMENT
    MATERIALS TESTING


  • Contact Us

    Cobb Engineering Company
    4516 NW 36th Street
    Oklahoma City, OK 73122-2426
    405.415.9400