Layout Image
  • Home
  • Our Company
    • History
    • Civil Servants
    • Officers
    • Managers
  • Services/Portfolio
    • Transportation
    • Land Development
    • Water
    • Airport
    • Power
    • Survey
    • GIS
    • Construction Management
    • Materials Testing
  • Contact Us
  • Careers
    • Current Openings
    • Employment Application
    • Internships and Scholarships

Water Projects

  • Water
    • WATER
      • OKC 48-Inch Water Main
      • 24-Inch East Water Line Loop
      • OKC 42-Inch Water Main
      • OSU Water Study
      • Stillwater Water Improvements
    • WASTEWATER
      • DPS Lift Station
      • OKC Sewer Rehab
      • Hunter’s Pointe Unsewered Area

Water Study – OSU

By Cobb Engineering Company
Monday, February 20th, 2012

Project Summary

The project consisted of a study of the feasibility of placing back into operation Oklahoma State University’s (OSU’s) water treatment plant (WTP), which had not been operated since 2001. Doing this would allow the University to provide its own water and would serve as a backup source of treated water for the City of Stillwater.  This study basically consisted of the following tasks:

  • Review current WTP status
  • Determined specific work needed to bring it up to current ODEQ standards
  • Investigate the raw water system to ascertain its ability to conveyance raw water from Lake Carl Blackwell to the WTP
Categories : Infrastructure: Water/Wastewater Design
  • Services

    TRANSPORTATION
    LAND DEVELOPMENT
    WATER/WASTEWATER DESIGN
    AIRPORT PLANNING AND DESIGN    
    POWER
    SURVEY
    GIS
    CONSTRUCTION MANAGEMENT
    MATERIALS TESTING


  • Contact Us

    Cobb Engineering Company
    4516 NW 36th Street
    Oklahoma City, OK 73122-2426
    405.415.9400